南山市北海公园景观建设工程施工组织设计

摘要
本文论述了具体建筑施工方面的问题,在施工过程中负责工序、施工质量和工程产品质检工作;对违章操作有质量隐患的工程产品有权责令其停工,并及时报项目经理限期改正,处理后方可复工;要认真填写施工质量评定表,整理好原始资料,参加施工“三检”的复检签证,对工程质量负直接责任。项目经理为项目施工第一责任人,全面负责整个项目的决策与管理工作,严格实行岗位责任制,提倡一人多职,一职多能的高效工作法,制定目标管理办法,实行安全、质量一票否决权,开展创精品工程活动和文明施工竞赛,力争安全、高效、文明、环保全面丰收。为了搞好项目工程树立企业形象,公司精心组织挑选项目班子,确定现场人员以确保工程的质量、安全、进度。同时,对施工过程中出现的问题和不合格品进行积极的整改和处理,避免后期出现质量问题。在这方面,要加强对施工现场的检查和复检工作,及时排除质量隐患,保证每个工序和产品都符合国家相关标准和规定,确保项目工程质量稳定可控,避免发生安全事故。

关键词 保障措施;施工措施;优创计划
Abstract
During the construction process, the person in charge is responsible for the work process, construction quality, and inspection of the engineering product quality. If there are potential quality hazards due to violations, they have the right to order a work stoppage and report to the project manager for correction before resuming work. They must fill out the construction quality evaluation form carefully, organize the original data, participate in the re-inspection visa of the construction "three inspections", and take direct responsibility for the engineering quality. The project department implements project management, with the project manager as the first person in charge of the construction, responsible for the decision-making and management of the entire project. A strict responsibility system is in place, and we advocate a high-efficiency work method of "one person,"safety and quality veto", and launched activities to create high-quality projects and civilized construction competitions, striving to achieve a comprehensive harvest of safety, efficiency, civilization, and environmental protection. In order to establish the company's image by doing well in project engineering, the company carefully selects the project team, determines the onsite personnel to ensure the quality, safety, and progress of the project. In order to ensure the quality of the project, we also pay attention to on-site management and technical support during construction. We carefully organize the construction personnel, implement various management systems, ensure on-site safety and orderliness, and controllable quality. At the same time, we actively rectify and handle problems and non-conforming products that occur during construction to avoid quality problems in the later stages. 

Keywords safeguard measures;Construction measures;Gen plan efficiency
目录
摘要 III
Abstract IV
第1章 绪论 1
1.1 研究背景和意义 1
1.2国内外研究 1
第2章 施工总体进度计划保障措施 3
2.1 .项目基本概况 3
2.2 施工进度计划安排 3
第3章 质量保证措施和创优计划 6
3.1 质量管理目标及方针 6
3.2 质量控制责任制 6
3.3 质量管理体系 6
第4章 主要分项工程施工方案和技术措施 10
4.1土方工程 10
4.2 铺装工程 11
4.3 给排水工程 13
第五章 保证施工安全的技术措施及保证体系 16
4.1安全生产方针 16
4.2安全生产机构 16
4.3安全管理措施 16
4.4分项工程施工安全技术措施 17
结论 18
参考文献 19
致谢 20
 
扫码免登录支付
原创文章,限1人购买
是否支付32元后完整阅读并下载?

如果您已购买过该文章,[登录帐号]后即可查看

已售出的文章系统将自动删除,他人无法查看

阅读并同意:范文仅用于学习参考,不得作为毕业、发表使用。

×
请选择支付方式
虚拟产品,一经支付,概不退款!