工程项目中的风险评估研究
摘 要
由于工程建设具有不同于普通产品的生产工艺,投资大,生产周期长,不确定的原因多,施工条件和市场条件的可控,若不加以预防,将会对施工的进行造成很大的阻碍,造成严重的后果。
目前,“风险控制体系”已经在世界范围内被广泛采用。目前,我国的工程建设项目风险管理工作相对滞后,与世界先进水平还有很大的距离,因此,开展对其进行风险控制的研究,对于促进我国的建设项目建设有着重大的理论和实践价值。文章从概括性的角度出发,从工程项目的角度出发,探讨了工程项目的风险辨识问题。文章最后根据风险管理的特点,从风险缓解、风险转移、风险自留、风险回避和风险监测等方面提出了相应的预防措施。
关键词:工程项目风险 风险管理 风险防范
Abstract
Because the engineering construction has different production process from ordinary products, large investment, long production cycle, many uncertain reasons, and controllable construction conditions and market conditions, if not prevented, it will cause great hindrance to the construction and serious consequences.
At present, the "risk control system" has been widely adopted worldwide. At present, the risk management of engineering construction projects in China is relatively lagging behind, and there is still a great distance from the world's advanced level. Therefore, carrying out research on risk control has great theoretical and practical value for promoting the construction of construction projects in China. This paper discusses the risk identification of engineering projects from the perspective of generality and engineering projects. Finally, according to the characteristics of risk management, the paper puts forward corresponding preventive measures from risk mitigation, risk transfer, risk retention, risk avoidance and risk monitoring.
Key words: Project risk risk management risk prevention
目 录
摘 要 I
Abstract II
1 前言 1
1.1 研究的背景和意义 1
1.2 研究方法 1
2 工程项目风险管理的一般理论 2
2.1 工程项目风险的概念界定 2
2.2 工程项目风险的特点 2
2.3 工程项目风险管理的含义及管理过程 3
2.4 工程项目风险管理的必要性 4
3 工程项目风险识别及分析 5
3.1 工程项目风险识别的依据 5
3.1.1 工程项目风险管理计划 5
3.1.2 项目规划 5
3.1.3 风险种类 5
3.2 工程项目风险识别的过程 6
3.2.1 收集资料 6
3.2.2 工程项目风险形势估计 6
3.3 工程项目风险识别的方法 7
3.3.1 头脑风暴法 7
3.3.2 德尔非法 7
3.4 工程项目风险的定性分析 8
3.4.1 定性分析依据 8
3.4.2 定性分析的方法 8
4 工程项目风险评价与控制 9
4.1 工程项目风险评价的依据 9
4.2 工程项目风险评价的过程 9
4.3 工程项目风险评价的方法 10
4.3.1 层次分析法 10
4.3.2 模糊风险综合评价 10
4.4 强化工程项目风险管理的对策 10
5 结论 13
参考文献 14
摘 要
由于工程建设具有不同于普通产品的生产工艺,投资大,生产周期长,不确定的原因多,施工条件和市场条件的可控,若不加以预防,将会对施工的进行造成很大的阻碍,造成严重的后果。
目前,“风险控制体系”已经在世界范围内被广泛采用。目前,我国的工程建设项目风险管理工作相对滞后,与世界先进水平还有很大的距离,因此,开展对其进行风险控制的研究,对于促进我国的建设项目建设有着重大的理论和实践价值。文章从概括性的角度出发,从工程项目的角度出发,探讨了工程项目的风险辨识问题。文章最后根据风险管理的特点,从风险缓解、风险转移、风险自留、风险回避和风险监测等方面提出了相应的预防措施。
关键词:工程项目风险 风险管理 风险防范
Abstract
Because the engineering construction has different production process from ordinary products, large investment, long production cycle, many uncertain reasons, and controllable construction conditions and market conditions, if not prevented, it will cause great hindrance to the construction and serious consequences.
At present, the "risk control system" has been widely adopted worldwide. At present, the risk management of engineering construction projects in China is relatively lagging behind, and there is still a great distance from the world's advanced level. Therefore, carrying out research on risk control has great theoretical and practical value for promoting the construction of construction projects in China. This paper discusses the risk identification of engineering projects from the perspective of generality and engineering projects. Finally, according to the characteristics of risk management, the paper puts forward corresponding preventive measures from risk mitigation, risk transfer, risk retention, risk avoidance and risk monitoring.
Key words: Project risk risk management risk prevention
目 录
摘 要 I
Abstract II
1 前言 1
1.1 研究的背景和意义 1
1.2 研究方法 1
2 工程项目风险管理的一般理论 2
2.1 工程项目风险的概念界定 2
2.2 工程项目风险的特点 2
2.3 工程项目风险管理的含义及管理过程 3
2.4 工程项目风险管理的必要性 4
3 工程项目风险识别及分析 5
3.1 工程项目风险识别的依据 5
3.1.1 工程项目风险管理计划 5
3.1.2 项目规划 5
3.1.3 风险种类 5
3.2 工程项目风险识别的过程 6
3.2.1 收集资料 6
3.2.2 工程项目风险形势估计 6
3.3 工程项目风险识别的方法 7
3.3.1 头脑风暴法 7
3.3.2 德尔非法 7
3.4 工程项目风险的定性分析 8
3.4.1 定性分析依据 8
3.4.2 定性分析的方法 8
4 工程项目风险评价与控制 9
4.1 工程项目风险评价的依据 9
4.2 工程项目风险评价的过程 9
4.3 工程项目风险评价的方法 10
4.3.1 层次分析法 10
4.3.2 模糊风险综合评价 10
4.4 强化工程项目风险管理的对策 10
5 结论 13
参考文献 14
致 谢 16