住宅小区工程设计阶段工程造价管理

题目:住宅小区工程设计阶段工程造价管理

 

摘要:本文以住宅小区工程设计阶段的工程造价管理为研究对象,对其背景、目的、国内外研究现状进行了综述。通过对住宅小区工程设计阶段工程造价管理的定义、特点和重要性进行分析,揭示了该领域存在的问题与挑战。在此基础上,提出了多方案技术经济分析、严格执行可行性研究报告及投资估算、利用“PDCA循环”的理念等工程造价管理策略。最后,总结了本文的研究成果。

关键词:住宅小区工程设计阶段、工程造价管理、多方案技术经济分析

 

Abstract:This paper takes the engineering cost management in the design stage of residential area as the research ob ject, and summarizes its background, purpose and research status at home and abroad. Through the analysis of the definition, characteristics and importance of engineering cost management in the design stage of residential district engineering, the problems and challenges in this field are revealed. On this basis, the paper puts forward several project cost management strategies, such as multi-scheme technical and economic analysis, strict implementation of feasibility study report and investment estimation, and the use of "PDCA cycle" concept. Finally, the research results of this paper are summarized.

Key wordsResidential area engineering design stage, engineering cost management, multi-scheme technical and economic analysis

 

目录

题目:住宅小区工程设计阶段工程造价管理 1

摘要: 1

1 绪论 2

1.1研究背景和目的 2

1.2国内外研究现状 2

1.3研究内容与方法 2

2.住宅小区工程设计阶段的工程造价管理概述 3

2.1工程造价管理的定义 3

2.2住宅小区工程设计阶段的特点 3

2.3住宅小区工程设计阶段工程造价管理的重要性 4

3.住宅小区工程设计阶段的工程造价管理的现状 4

3.1预算控制不严 4

3.2缺乏专业人才 4

3.3信息化程度不高 5

4.住宅小区工程设计阶段的工程造价管理问题与挑战 5

4.1建设工程造价管理观念有待提升 5

4.2不重视前期阶段的造价控制 5

4.3信息化程度不高 6

5.住宅小区工程设计阶段的工程造价管理策略 6

5.1多方案技术经济分析,优化设计方案 6

5.2严格执行可行性研究报告及投资估算 6

5.3利用“PDCA循环”的理念 7

结论 7

参考文献 8

致谢 8

 
扫码免登录支付
原创文章,限1人购买
是否支付36元后完整阅读并下载?

如果您已购买过该文章,[登录帐号]后即可查看

已售出的文章系统将自动删除,他人无法查看

阅读并同意:范文仅用于学习参考,不得作为毕业、发表使用。

×
请选择支付方式
虚拟产品,一经支付,概不退款!