试论工程施工阶段工程变更与索赔

题目:试论工程施工阶段工程变更与索赔

 

摘要:本文旨在研究工程施工阶段工程变更与索赔的相关问题。通过对国内外研究现状的调研,分析工程变更与索赔的基本理论和重要性,探讨工程变更管理的原则、流程、方法和技巧。同时,对影响工程变更与索赔的因素进行分析,包括设计因素、施工因素和管理因素。在分析问题存在的基础上,提出了预防工程变更和降低工程索赔的措施,并强调建立有效的沟通机制和协调机制的重要性。最终,通过对论文内容的总结,得出结论,即在工程施工阶段,合理管理工程变更和索赔,预防问题的发生,并提出相关建议。

关键词:工程施工阶段,工程变更,索赔

 

Abstract:The purpose of this paper is to study the related issues of engineering change and claim in the construction stage. This paper analyzes the basic theory and importance of engineering change and claim, and probes into the principles, processes, methods and skills of engineering change management. At the same time, the factors affecting engineering change and claim are analyzed, including design factors, construction factors and management factors. On the basis of analyzing the existing problems, this paper puts forward the measures to prevent engineering changes and reduce engineering claims, and emphasizes the importance of establishing effective communication mechanism and coordination mechanism. Finally, through the summary of the content of the paper, the conclusion is drawn, that is, in the construction stage of the project, reasonable management of engineering changes and claims, prevent the occurrence of problems, and put forward relevant suggestions.

Key wordsEngineering construction phase, engineering change, claim

 

目录

题目:试论工程施工阶段工程变更与索赔 1

摘要: 1

1 绪论 2

1.1研究背景和目的 2

1.2国内外研究现状 2

1.3研究内容与方法 2

2.工程施工阶段工程变更与索赔基本理论 3

2.1工程变更的定义 3

2.2工程变更的分类 3

2.3工程索赔的依据和程序 3

3.工程施工阶段工程变更管理 4

3.1工程变更管理的重要性 4

3.2工程变更管理的原则和流程 4

3.3工程变更管理的方法和技巧 5

4.影响工程施工阶段工程变更与索赔的因素分析 5

4.1设计因素 5

4.2施工因素 6

4.3管理因素 6

5.工程施工阶段工程变更与索赔存在的问题 6

5.1信息不对称 6

5.2法规政策执行不到位 7

5.3技术和管理能力不足 7

6.针对问题的解决策略与建议 7

6.1预防工程施工阶段工程变更的有效措施 7

6.2降低工程施工阶段工程索赔的有效途径 8

6.3建立有效的沟通机制和协调机制 9

结论 9

参考文献 9

致谢 10

 
扫码免登录支付
原创文章,限1人购买
是否支付32元后完整阅读并下载?

如果您已购买过该文章,[登录帐号]后即可查看

已售出的文章系统将自动删除,他人无法查看

阅读并同意:范文仅用于学习参考,不得作为毕业、发表使用。

×
请选择支付方式
虚拟产品,一经支付,概不退款!