建筑给排水工程施工组织优化研究

摘  要
施工组织设计是指导施工前期、后期建设工作的技术和经济资料,是实施科学的施工管理措施,是确保项目开工后的施工活动有序、高效、科学合理地进行的保障。建筑组织设计是建筑技术与管理的结合,是指导建筑工人进行技术经济工作的关键技术和经济指标,其自身的优劣直接关系到项目的成功与经济效益。
然而,目前的给排水管项目施工组织设计的编制工作,表现出了由于建设中积累的技术资料不能得到有效和充分的利用,而编写的给排水工程的施工组织设计,多追求建设效益而忽略经济效益,存在只重视组织技术措施,而没重视经济管理的内容等问题,以致在实施过程中,没有实现经济效益目标,没有起到施工组织设计应有的作用。在确保项目质量、效益、强化施工管理、增加项目效益方面,对建设单位进行合理的施工组织设计具有十分关键的意义。文章从施工计划、质量控制、进度计划控制三个方面进行了详细的论述,提出了优化施工方案、合理安排进度、强化质量管理、优化技术和优化技术。最后,以某项目为例,论证了在建筑物给排水工程中进行施工方案优选的可能性与意义。

关键词:给排水工程施工  施工组织设计  优化





Abstract
The construction organization design is the technical and economic data to guide the construction work in the early and late stages of the construction, is the implementation of scientific construction management measures, and is the guarantee to ensure the orderly, efficient, scientific and reasonable construction activities after the commencement of the project. Construction organization design is the combination of construction technology and management, and is the key technical and economic indicator to guide construction workers to carry out technical and economic work. Its own advantages and disadvantages directly affect the success and economic benefits of the project.
However, the current preparation of the construction organization design of the water supply and drainage project shows that the technical data accumulated in the construction can not be effectively and fully utilized, and the construction organization design of the water supply and drainage project prepared mainly pursues the construction benefits while ignoring the economic benefits, and there are problems such as only paying attention to the organizational technical measures, but not the content of economic management, so that the economic benefit ob jectives are not achieved in the implementation process, It has not played its due role in the construction organization design. In terms of ensuring the quality and benefit of the project, strengthening the construction management and increasing the project benefit, it is of great significance to carry out reasonable construction organization design for the construction unit. This paper discusses the construction plan, quality control and schedule control in detail, and puts forward the optimization of construction plan, reasonable schedule, strengthening quality management, optimization technology and optimization technology. Finally, taking a project as an example, the feasibility and significance of optimizing construction scheme in building water supply and drainage engineering are demonstrated.

Key words: Water supply and drainage engineering construction  construction organization design  optimization

目  录
摘  要 I
Abstract II
1 前言 1
1.1 研究的背景和意义 1
1.2 国内外研究 2
1.2.1 国内研究 2
1.2.2 国外研究 3
2 施工组织设计基本理论 3
2.1 施工组织设计的含义和作用 3
2.2 施工组织设计的分类 4
2.3 单位工程施工组织设计的内容 4
2.4 给排水工程施工组织编制要点 5
3 施工组织设计优化方法 6
3.1 优化施工方案 6
3.1.1 施工方案的作用 6
3.1.2 施工方案的选择依据和意义 6
3.1.3 施工方法的经济选择 7
3.1.4 合理安排施工顺序,降低施工项目成本 7
3.1.5 合理安排施工作业组织 7
3.2 合理安排施工进度,降低工期成本 7
3.2.1 进度控制的作用 7
3.2.2 进度与成本的关系 8
3.2.3 选择最佳进度降低施工成本 8
3.3 加强施工质量管理,降低工程成本 8
3.3.1 质量与成本之间的关系 8
3.3.2 加强质量管理,控制成本 9
4 案例分析 9
4.1 工程概况 9
4.2 施工方案优化 10
4.3 合理控制施工进度 10
4.3.1 进度控制工作流程 10
4.3.2 进度控制措施 11
4.4 进度控制、质量控制与成本目标的协调 11
5 结论 12
参考文献 13
致  谢 15
 